GM signs deal with MIT-spinout to reduce electric vehicle battery costs by 60% Posted on March 11, 2021March 11, 2021 by anonymous Hipster This post was originally published on this siteGM and SolidEnergy Systems plan to build a prototype production line in Massachusetts for a “high-capacity, pre-production battery by 2023.”